Construction of
Carnaby Lake
2

Most of the clay to form the vertical
walls was dug from one area of the base where the underlying clay was
particularly deep

Can you spot the bulldozer ?

The excavator digs the trenches that
are to be filled with clay to form the
vertical walls. These walls are about
3 metres deep by 1.5 metres wide.
The sloping sides of the lake begin to
take shape.